New Lighting in all Detroit Metro buildings: 1 million+ square feet
UPS Toledo Hub: 350,000 square feet
Developed a Strategic Energy Plan for ERPC:
- Conducted energy audits for 8 buildings totaling over 600,000 square feet, including lighting, energy cost, boiler and heating systems, ventilation systems, energy management systems including automated HVAC and lighting controls.
- Developed project cost analyses, and an energy model for the district, including calculated savings from energy related upgrades.
- Reviewed renewable energy options.
- Reviewed options for financing and implementation.
- Conducted energy audit for a facility of over 1,535,840 feet
- Proposed cost savings- 1st year: 23.2%
- Simple payback after 3.10 years
Energy Consultant:
- Re-commissioning of existing Administration Building,
- Pre-commissioning and consulting services for new construction of 4 Tech. Center campuses,
- Providing energy consulting services for other Oakland County school districts.
Designed and managed the installation of:
- The District-wide EMS for 8 buildings (System Integration) totaling approximately 600,000 square ft.
- Upgrade of T8 lighting systems in 8 buildings,
- Conversion of HVAC units to DDC,
- Installation of variable speed motors and building occupancy-determined control.
Project Cost: $500,000
Estimated Savings: >$100,000
Designed and managed the installation of
- The District-wide EMS for 3 buildings (Alerton System) totaling approximately 300,000 square feet,
- New boilers in 2 buildings,
- Upgrade of T8 lighting systems in 3 buildings.
Project Cost: $600,000
Estimated Savings: >$150,000
Designed and managed the installation of:
- The District-wide EMS for 10 buildings (Siemens System) totaling approximately 600,000 square feet,
- New boilers in the High School and 4 elementary schools,
- Installing new transformer at the Middle School and upgrading to Primary Rate,
- Retrofitting entire District to T8 lighting system.
Financing: Michigan Energy Bonds
Project Cost: $1,100,000
Estimated Savings: >$150,000
Designed and managed the installation of:
- The District-wide EMS for 10 buildings (Trane Summit System) totaling approximately 1 million square feet,
- Retrofit of entire District to T8 lighting system,
- Converting two schools from steam to hot water heating and installation of new boilers.
Financing: Michigan Energy Bonds
Project Cost: $2,512,736
Estimated Savings: >$500,000
|
|
|
|
 |